BTS Carrefour Psary

Development of an industrial hall with a green roof for Carrefour Polska


Usable area50,000 sq. mCityPsaryLocationZwycięstwa StreetProvinceSilesiaCompletion date2022Tenant / OwnerCarrefour PolskaCertificationBREEAM Excellent

General contractor Harden Construction has completed BTS Carrefour Psary logistics centre. The investment for Carrefour Polska has been carried out in Psary, in the Province of Silesia. The project is distinguished by a modern green roof with an area of nearly 5,000 sq. m. The warehouse covers nearly 50,000 sq. m. In addition, the facility comprises 13,000 sq. m of high-tech cold storage and 1,800 sq. m of office space. 80 tonnes of reinforcing steel, 950 cubic metres of structural concrete, 300 columns, and 350 prefabricated walls and foundations were used in the construction process. The roof is made of a steel structure with a total weigh of approximately 750 tonnes. The facility has 155 dock gates. Due to the professional organisation in terms of health and safety, no accidents occurred during the construction. The project has been carried out in line with the company’s key objective of supporting the principles of sustainability. The newly developed Carrefour Psary BTS building has been awarded the BREEAM certificate at the Excellent level.

t